Warehouse & Industrial Reinstatement
Compliant reinstatement for JTC & private industrial
We restore warehouses, factories, and industrial units to their original condition — meeting JTC guidelines and private landlord requirements, on time and without disruption to your operations.
Why clients choose us
15+
Years of reinstatement experience in Singapore
BCA
Registered contractor fully licensed
48hr
Mobilisation for urgent lease deadlines
100%
Compliance with JTC & landlord inspection requirements
Our scope of works
Complete warehouse reinstatement services
From heavy industrial dismantling to structural restoration and final cleaning, we manage the entire reinstatement process to ensure a smooth, compliant handover.
Racking & shelving removal
Safe dismantling and removal of heavy duty racking systems, pallet racks, cantilever shelving, and associated ground anchor bolts with slab patching included.
Mezzanine floor dismantling
Structural removal of steel mezzanine platforms, staircases, and guardrails. Floor penetrations reinstated and made good to original specification.
Industrial floor restoration
Degreasing, crack repair, and resurfacing of concrete warehouse floors. Loading bay and dock leveller areas restored to original condition.
Electrical & M&E works
Removal or reinstatement of high-bay lighting, power distribution boards, socket outlets, and mechanical and electrical fittings to landlord-approved layout.
Fire protection systems
Reinstatement of sprinkler heads, fire shutter systems, and emergency lighting to comply with SCDF requirements and original building layout.
Waste removal & final clean
Full clearance of industrial waste and debris in compliance with NEA regulations, followed by thorough cleaning in preparation for landlord inspection.
Our work
Selected projects
A sample of commercial renovation and reinstatement projects we have completed across Singapore.
Property types
JTC & private landlord compliance
Different property types carry different reinstatement obligations. Our team is experienced in both, ensuring your handover meets the specific requirements of your tenancy agreement.
Government Industrial Estate
JTC Reinstatement
JTC Corporation imposes strict reinstatement requirements for all industrial tenants. Failure to comply can result in forfeiture of deposits and additional charges. Our team understands JTC’s specific standards and ensures full compliance.
- Compliance with JTC’s Tenancy Reinstatement Obligations
- Submission and coordination with JTC inspectors
- Removal of all approved and unapproved additions
- Restoration to base building standard as per original layout
- Patching of all floor, wall, and ceiling penetrations
- Proper waste disposal with NEA documentation
Privately Owned Industrial Property
Private Landlord Reinstatement
Private industrial landlords typically reference the tenancy agreement for reinstatement scope. We work directly with your landlord or property manager to confirm requirements and ensure first-inspection approval.
- Review of tenancy agreement reinstatement clauses
- Direct liaison with landlord or property manager
- Photographic documentation before and after works
- Structural restoration of all tenant modifications
- Reinstatement of M&E and fire systems
- Final cleaning and handover documentation
How it works
Our reinstatement process
A structured approach that keeps your project on schedule and ensures landlord approval at the first inspection.
01
Site assessment
We conduct a complimentary site visit to assess the scope of works, review your tenancy obligations, and identify any compliance requirements.
02
Detailed quotation
A transparent, itemised quote is provided within 48 hours of the site visit no hidden costs, no surprises at handover.
03
Works execution
Our experienced crew mobilises on schedule. Works are carried out safely, efficiently, and in accordance with building regulations.
04
Inspection & handover
We accompany you during the landlord or JTC inspection and address any outstanding items promptly to secure first-pass approval.
Common questions
Warehouse reinstatement FAQ
Answers to the questions we hear most often from industrial tenants preparing to vacate.
JTC reinstatement is governed by JTC Corporation's specific tenancy obligations, which tend to be more prescriptive. Private landlord requirements are based on the individual tenancy agreement. Both require the property to be returned to its original condition we are experienced in meeting the standards of each.
Yes. We manage the full removal and disposal of dismantled fixtures, racking, and industrial waste in compliance with NEA regulations. Documentation can be provided upon request.
We accompany all final inspections and address any outstanding items promptly. Our aim is to achieve landlord or JTC approval at the first inspection, and we stand behind our work should any follow-up be required.
The duration depends on the size of the unit and the extent of modifications. A standard warehouse reinstatement generally takes between three and ten working days. We will advise on the expected timeline after a site assessment, and can schedule works around your operational requirements.
Yes. We are able to schedule reinstatement works during evenings, weekends, or public holidays to comply with building management requirements or minimise disruption to neighbouring tenants.
Cost is based on the unit size, the scope of works required, and the complexity of the tenant modifications. A site assessment is needed to provide an accurate quotation. There are no hidden charges all costs are itemised in our written quotation before works commence.
























